Home addition and renovation architects in Toronto

Reviewed by Saadman Ahmed, OAA, Principal Architect at Linerra Architects. Last updated .

Linerra Architects designs home additions and renovations in Toronto, and prepares the zoning review and the building permit drawings. The work includes rear additions, second-storey additions, interior renovations and full gut renovations of older houses. Linerra Architects also coordinates the structural, mechanical and electrical engineers, so the owner deals with one firm.

Types of projects

  • Rear addition. More space on the ground floor or on two floors, at the back of the house.

  • Second-storey addition. A new floor on top of a bungalow or a one-and-a-half-storey house. Builders often call it a top up.

  • Interior renovation. A new layout inside the same walls: kitchen, bathrooms, stairs, basement.

  • Gut renovation. A full renewal of an older house. Read the Linerra Architects guide to a gut renovation of a century home in Toronto.

  • Added units. A basement apartment, a garden suite or laneway suite, or a change to a multiplex.

The steps for an addition in Toronto

  1. Zoning review. Linerra Architects checks the zoning by-law for the lot: height, setbacks, building depth, lot coverage, floor area and landscaping. This shows how large the addition can be.

  2. Design. Linerra Architects draws the plans, elevations and 3D views, and adjusts them with the owner.

  3. Minor variance, if needed. If the design does not meet the zoning by-law, the owner can apply to the Committee of Adjustment for a minor variance.

  4. Permit drawings. Linerra Architects prepares the building permit drawings and coordinates the engineers.

  5. Building permit. The owner or Linerra Architects files the application with Toronto Building.

  6. Construction. Linerra Architects can review the work on site and answer the builder's questions.

City of Toronto times and fees

ItemWhat the City of Toronto states
Permit review, house streamWithin 10 business days for a complete application
Express ServicesThe goal is a review within 3 business days, for eligible small projects on a house with not more than two dwelling units
Zoning Applicable Law Certificate$644.38 in 2026 for a new house, an addition or an alteration. The City credits the fee to the permit fee. A complete permit application includes this certificate.
Minor variance application$2,228.98 in 2026 for additions and alterations to an existing dwelling with three units or less

The review time starts only when the application is complete. Without the zoning certificate, the City gives no time frame for the review.

Older houses and the Building Code

Part 11 of the Ontario Building Code (2024 edition) applies to existing buildings that are at least five years old (Division A, Sentence 1.3.3.3B.(1)). Part 11 treats a basic renovation and an extensive renovation in different ways. In an extensive renovation, where interior walls, ceilings, floors or roofs are substantially removed and rebuilt, the new structural and fire-resistance elements must meet the rules for new construction (Division B, Sentence 11.3.3.2.(1)). Linerra Architects sets the renovation type early, because it changes the scope and the cost.

What clients say

A homeowner in the Beaches area of Toronto wrote in a Google review: "We wanted to do just an interior renovation first, but after working with them, we decided to also do a rear extension to increase our property value. These guys got me the permit very quickly with no comments from the city."

Common questions

Do I need an architect for a home addition in Toronto?

Ontario law does not require an architect for most houses. The Architects Act exempts a house of not more than three storeys with one dwelling unit, or two attached dwelling units each built directly on grade (section 11(3)(b)). An owner may hire an architect or a registered designer with a BCIN. See architect or BCIN designer. An architect is useful when the project has zoning limits, a minor variance, structural changes or several consultants.

How long does a building permit for an addition take in Toronto?

The City of Toronto reviews a complete application in the house stream within 10 business days. Small eligible projects can use Express Services, which has a goal of 3 business days. The time to prepare the drawings and to get the zoning certificate comes before that.

What if my addition does not meet the zoning by-law?

The owner can change the design to comply, or apply to the Committee of Adjustment for a minor variance. In 2026 the City fee for a minor variance for an addition to a dwelling with three units or less is $2,228.98. Read about the Committee of Adjustment.

Can Linerra Architects work with my builder?

Yes. Linerra Architects prepares drawings that builders use to price and to build the project. Linerra Architects can also review the work during construction.

How much does an architect cost for a renovation in Toronto?

Linerra Architects gives a written fee proposal after it reviews the property and the project goals. The fee depends on the size of the project, its complexity and the permits it needs. The first consultation is free.

Plan your addition or renovation

Send Linerra Architects the address of the property and a short note about the project. The first consultation is free. Linerra Architects then reviews the zoning for the lot and sends a written fee proposal.

Start Your Project Call (437) 992-6347

Related pages

Sources

Linerra Architects checked each source on November 25, 2026. Rules change, so confirm the current rule for a specific lot before any design work starts.

Call +1 437 992 6347
info@linerra.com